Contact Engineering & Global Sales

Connect directly with SynQor's U.S.-based power design experts and international sales representatives for product inquiries, custom power architectures, and program procurement support.

Direct Application Support

Expert Assistance for Mission-Critical Power Systems

Whether you are designing a high-reliability military power platform, evaluating EN 50155 rail converters, or integrating AS9100 aerospace power modules, our senior engineering team is ready to evaluate your system requirements.

Technical Engineering Support

Direct communication with experienced power electronics design engineers for thermal derating, EMC design review (MIL-STD-461 / DO-160), and custom topology assistance.

Response Window: 24 – 48 Hours HQ Location: Salem, NH, USA

Global Sales & Procurement

Dedicated regional account managers to assist with RFQs, volume pricing, lead times, order tracking, and authorized international distributor connections across North America, Europe, and Asia-Pacific.

Phone: (603) 541-4141 Quality Rating: ISO-9001 & AS9100

Program Obsolescence & Quality

Multi-decade program continuity support, Form-Fit-Function replacements, qualification test archives, and direct factory traceability for long-lifecycle defense and industrial systems.

U.S. Manufacturing Facility Full Traceability Compliance
Technical Checklist

Information to Include for Rapid Technical Evaluation

To help our field application engineers recommend the most efficient converter or complete filter-and-module power architecture, please prepare the following baseline parameters:

1

Input & Output Electrical Profiles

Specify nominal input voltage, continuous surge range (e.g., MIL-STD-704 / MIL-STD-1275), required output channels, line regulation tolerance, and peak startup current profiles.

2

Environmental & Thermal Constraints

Define operating temperature limits (−40°C to +100°C baseplate), cooling methodology (conduction cold plate, forced air, or sealed enclosure), shock, and vibration profiles under MIL-STD-810G or EN 50155.

3

Target Compliance & EMC Standards

Identify required military or industrial EMC limits, such as MIL-STD-461 (C-F), RTCA/DO-160G, Airbus/Boeing aircraft power specifications, or EN 60601-1 ed 4.0 medical safety standards.

4

Mechanical & Form-Factor Preferences

Detail board footprint limits (quarter-brick, half-brick, full-brick modules) or rack enclosure requirements (1U/2U 19-inch rack-mount UPS, inverters, and power supplies).

Frequently Asked Questions

Technical & Procurement Consultation FAQ

Technical and procurement requests sent to SynQor are assigned directly to regional sales specialists and field application engineers. Standard response times are within 1 to 2 business days for technical evaluation and thermal/EMC design support.

Please provide your required input voltage range, nominal/peak load profiles, environmental conditions, thermal management method (conduction, forced air, ambient), and targeted standards such as MIL-STD-704, MIL-STD-461, RTCA DO-160, or EN 50155.

Yes. SynQor operates under an AS9100 and ISO-9001 certified quality system in Salem, NH, USA. We offer complete supply-chain transparency, material traceability, full qualification testing data, and long-term obsolescence protection for mission-critical defense and industrial programs.

Ready to discuss your custom power architecture?

Connect with our technical representatives immediately to request data sheets, evaluation boards, or customized product quotations for your upcoming program.

Get a Quote